10BBL fire heating brewhouse
This video shows the completion of the 10bbl fire heated saccharification system and the assembly of the pipes, with some semi-finished fermenters and stacked sake tanks in the distance
-
Good news, eight 5000L fermenters have been completed
Good news, eight 5000l fermenters have been completed. This is an order from Australia, which will be loaded at the end of July. We are committed to providing high quality products to our customers worldwide
-
Workshop construction site display
Recently, our workshop is very busy. Today, we will talk about the order from New York, USA: For the 30bbl fermentation tank, we are carrying out pressure test on the jacket. Usually, we will test two rounds, each round of 15-20 hours, to avoid leakage phenomenon after installation of cladding.
-
3bbl oil heating brewing system shipped to Nashville, USA
3 bbl oil heating brewing system for shipping to the United States is finished.We cleaned it and tested it to work perfectly, then we packed it in wooden box. Soon, the customer's forwarder will come to our factory to pick up the goods. 30bbl and 90bbl mixing tanks are producting still, there are so many tanks in our factory.
-
We're installing fermenters for our customers in Japan,they have 9 fermenters now include these two 600L fermenters
A few weeks ago, this Japanese customer said they wanted to add 3 fermentation tanks. The next day, we measured the site for this customer, determined the placement method, tank height, and layout of pipeline and circuit control. Today, we are installing fermentation tanks for our customers in Japan. They now have 12 fermentation tanks, including these three 600L fermentation tanks. We bought some spare valves and pipelines, and then transported our equipment and required accessories to their store to start construction. We spent 3 hours in...
-
30bbl mixing tanks are finished and waiting for shipping
The 30bbl mixing tank, which took more than a month from material preparation to completion, was finally completed, we can see that from the top head to the leg, from the manhole to the mixing paddle, our welding and polishing are very perfect, jacket pressure test and equipment trial operation is also very ok. This customer contacted us through Google. It has been three years since the contact was established. He has placed three orders, including brewing system, fermenters, mixtang tank, cip and other equipment. I hope our customers' business is getting better and better!
-
30BBL mixing tank with pressure test stage.
30BBL mixing tank to be shipped to Denver USA is undergoing final pressure test. We need to maintain the sealing performance of the mechanical seal, push the pressure inside the tank to 2.6bar, and observe whether the pressure can be maintained when the reducer is at rest and running. It takes a lot of practical experience and good welder skills to keep the pressure inside the tank constant. We are COFF, can do that.
-
7BBL Electric heating brewing system has been shipped to Crown Dr , Batesville, USA
All the 7BBL stackable fermenters, 7BBL single layer brite tanks and 7BBL electric heating brewing system are loaded on January 11, 2023. A 45-foot container is loaded with a total of 20 tanks and 121 stainless steel beer kegs, as well as mill + flex auger. In order to save transportation costs for customers, we try our best to fill the container as much as possible. The Coff used the entire container space to upgrade client's profit. This is what all staffs at Coff always do.